Weekly Progress Update 1/6/23
- agertz
- Jan 9, 2023
- 1 min read
This Week
Started putting the framing back together in exterior parking area ceiling
Installed ceramic tile in restrooms
Painted walls and ceiling on second floor
Ceiling close-up inspection on the second floor
Drywall and taping of ceilings after inspection
Drop ceiling tile
Next Week
Continuing thermal insulation around exterior beam enclosures on first floor
Mechanical rough-in on first floor ceiling
Drywalling walls on the first floor
Start floor prep on second floor
Start ceiling work above monumental staircase
Continuing ceramic tiles in the restrooms
Shade infrastructure installation
Starting the curtain wall
Below are some activities taking place next week as we continue to stay on schedule.
General reminders
During construction, parking spaces have been assigned. Please ensure that you use only your spot or park offsite.
Visitors will not be able to park in the lot and visiting employees should be prepared to find remote parking. Double parking will not be permitted.
Emergency issues related to the 643 renovations should be routed to Jack Brown at 847-338-4308.
All general building maintenance/engineering issues should still be sent to Tom Brannon at 847-609-7893.
Comments